My proposal was approved by the city/county/town having jurisdiction. What do I do now?
Bring two sets of your building plans to the PFA Bureau, which is at 102 Remington St. in Fort Collins. We’ll review your plans with about a two-week turnaround time. We ......
Not Rated Last Update: 2009-05-01 Views: 2
When do I need to call for an inspection?
Your contractor will need to call the PFA final inspection line at least 48 hour in advance to schedule the inspection. (For example, if you call by 5 p.m. Tuesday, your ......
Not Rated Last Update: 2008-09-28 Views: 3
My building is almost finished. Now what?
Your contractor will need to call PFA to schedule an inspection. Our inspector will look to make sure applicable requirements have been met, such as exit hardware and signage, emergency lighting, ......
Not Rated Last Update: 2008-09-28 Views: 2
My building requires automatic fire sprinklers. When are they inspected?
In addition to testing the sprinkler system at final inspection, PFA will do a “rough-in” inspection during the sprinkler installation process. Your contractor must call for an inspection before hard lids ......
Not Rated Last Update: 2008-09-28 Views: 1
When is an occupant load sign required?
An occupant load sign is required in all “rooms of assembly” not having fixed seats. This may be a church sanctuary, a restaurant or a movie theater. The occupant load sign ......
Not Rated Last Update: 2008-09-28 Views: 4